Adhesive Tape

Adhesive Tape

General Adhesive tape for road is a kind of road maintenance material, specially designed for repairing cracks on asphalt or concrete pavements. It is composed of high-viscosity modified asphalt base material and high-strength fiber layer, featuring excellent tensile strength and durability. It...
Send Inquiry
Description

General

 

Adhesive tape for road is a kind of road maintenance material, specially designed for repairing cracks on asphalt or concrete pavements. It is composed of high-viscosity modified asphalt base material and high-strength fiber layer, featuring excellent tensile strength and durability. It can effectively prevent water penetration and extend the service life of the road surface.

Composition

 

High-viscosity modified asphalt substrate is compounded with high-strength fiber layer.

Product properties

 

 

Thickness:2.0MMM,2.5MM,3.0MM,3.5MM.4.0MM

Width:3CM 4CM, 5CM. customization

Length:10m,15m.customization

Sorbitol: Smooth surface. Sand surface. Reinforcement can be added.

Application

 

Adhesive tape for road Core advantage

Convenient construction: No special equipment is required. Just peel off the film and stick it on. It can be operated by a single person, significantly improving the maintenance efficiency.

Strong adaptability: It maintains stability within the temperature range of -30℃ to 80℃ and is suitable for various climatic conditions.

3.Long-lasting and durable: Resistant to wear and aging, closely adheres to the road surface, and does not easily fall off.

Adhesive tape for road application scenarios

It is widely used for crack repair in municipal roads, residential areas, parking lots and other areas, and is particularly suitable for emergency repairs and preventive maintenance.

matters need attention

Before construction, it is necessary to remove any debris from the cracks and ensure that the bonding surface is dry and flat, in order to achieve the desired effect.

Self-adhesive crack-resistant patch application method

 

product-650-650

first step

Road surface cleaning and treatment

It is necessary to remove dust, water and other debris from the adhered surface to keep the road surface dry and clean.

2. For cracks (seams) with a width ranging from 5 to 19 millimeters, they must be thoroughly cleaned and then filled with sealant.

3. For cracks (seams) and depressions with a width ranging from 19 to 50 mm, they must be thoroughly cleaned. Then, fill them with sealant or asphalt mixture and compact them to the current height.

4. For cracks or potholes with a width exceeding 50mm, they must first be cleaned thoroughly, then filled with cement mortar or hot asphalt mixture and compacted to the original height.

5. For cracks (seams) of different heights and areas with subsidence, leveling treatment must be carried out.

6. For any protrusions on the bridge deck or pavement, they must be removed or leveled to achieve a smooth surface.

Check the environmental conditions

1.It should be used when the surface temperature is equal to or greater than 21°C.

2. If the surface temperature is lower than 10°C, it is recommended to use a low heat setting when applying the anti-cracking patches. The patches should be flat, without wrinkles or edges that lift off.

3. During the laying process, if there is any overlap, the overlap length should be 50MM and it should not exceed two layers of overlap.

4. It is recommended to apply the polymer crack-resistant tape and then use a rubber roller to roll it at least three times

5. After the laying is completed, vehicles can be allowed to pass. The interval between this and the laying of the upper layer should not exceed 24 hours.

 

asphalt overlay

 

1.After the crack-resistant tape is properly laid, it should be firmly bonded to the upper layer of the construction to avoid moisture and rain exposure.

2. After laying the anti-crack strips, according to the construction specifications of hot asphalt mixture, apply emulsified asphalt or other tack oils. To prevent vehicles or the paver from adhering to the anti-crack strips, some fine-grained crushed stones or mixtures can be sprinkled on the anti-crack strips.

3. The thickness of the hot asphalt mixture laid on the crack-resistant tape should be greater than 40MM

 

product-650-650

Hot Tags: adhesive tape, China adhesive tape manufacturers, suppliers, factory